Tuesday, November 25, 2014

All about ribs

Today we spent the whole day working and made quite a bit of progress. 

First, we finished gluing the ribs and the corner edges through the ribs by shaving the inside of specific ribs .


A & B ribs shaved to fit the drag spar
After that, we riveted the few parts still being held by clecos and finally we covered the glued ribs with the aluminum tape.


Drag Spar in place








Close up of the taping 




Wing end corners



















Another view of a corner 


















The process is not hard but it is quite time consuming. 


To get a wing done we used three rolls of the fiberglass lined adhesive tape and almost two of the aluminum tape. This means i'll be short 2 rolls of the fiberglass and one of the Aluminum.. I've looked for it everywhere with no luck, so, I guess I'll have to get it imported from the US...

*Luckily some friends are coming to visit us for turkey day.. hopefully they'll bring me some.
finished with one wing and waiting for parts to do the next



Finished wing edge
Compresion tube suport 
Compression tube and aileron control mechanism
Completed wing

Sunday, November 16, 2014

Gluing the ribs

Continuing with the wing assembly, yesterday we began the process of setting the foam ribs in place.

As described by the kit instructions, we start by applying a thin layer of Gorilla glue (previously mixed with water) on each end. Then, after setting them in place we wrapped them around with fiber glass tape. Gorilla glue expands quite a bit, so it is key to place *and tape* one rib at a time, otherwise you run the risk that the expanding glue will shift things around. The roaster jig that mike suggested we built for the wing, helped a lot in the rib setting process.


After the first set of ribs was in place, we decided to place the the drag strut diagonally through the rib holes.  We carefully shaved the rib's holes on the inside, just enough to allow the drug strut to fit in place with out bending any of the ribs.


By the end of the day , we finished the first section with pretty good results. All in all , the process is not difficult, it just takes a little patience to get the ribs placed right.



First section glued and tape wrapped



To be honest, the hardest part was to handle the amount of on lookers that kept dropping by, to chat and check things out !
See you next week!




Thursday, October 30, 2014

Give me wings !

Continuing with the assembly of the goat, yesterday I put together the left wing according to the instructions sent by Michael. The instructions are no more than a page of basic instructions (no pictures).

Using the original Mike Sandling goat 1 drawings I was able to figure out most of the assembly. The few things that left me puzzled where answered by Michael (via Jon) that same afternoon.

There are a few differences between the original and this Super Goat. One is that the X shaped drag cables on the first section of the wing, have been replaced by a single drag tube. Another is that the second set of drag cables (the one on the second section of the wing) are gone altogether! I am guessing that the new style of rigid foam ribs will give good structural integrity to the assembled wing. The new style ribs are made out of a foam board called Pactiv Extruded Polystyrene Foam Board Insulation. I looked at the material info on them and they seem to have pretty good compression resistance. the way they are   installed is glued *and* wrapped by fiberglass and aluminum tape. I am pretty sure this should create a pretty good strength against expansion.

We also assembled and tested the rotissery wood setup made to help install the ribs (neat!)

Time ran out, so we stored the wing as it was (all put together with clecos ) on the hanger, and left for lunch. Tomorrow I will be testing the fabric glue and the ribs glue to see ho that works.





Thursday, October 23, 2014

Piano piano, si va lontano

It is Thursday but I was able to escape work and go to the club to try and make a little dent on the work ahead. We have many other projects going on, so we are taking it slow.

Being so close to the ocean, corrosion is a big issue for us. As first order of business we are planning to paint all the aluminum tubes except the areas where glue for fabric covering will be applied.


For today we just set up both wings on the floor in to make sure all parts where complete and that we understood how the final assembly would go. All parts are nicely marked red or blue for left and right, and front, bottom, unfortunately, I will have to remove all markings before applying zinc based paint and then re-label.

Not much else to tell, hopefully I'll get more done this weekend.

Another picture from last weekend.



Monday, October 20, 2014

You only get one chance to make a good first impression.

For today, ( Sunday ) we had a pretty tight work schedule, as we are trying to get all planes ready for November 8th when the club will have it's yearly flight festival. We really want to put a good show.

By the time I arrived to the hanger, the place was  running full steam. On one side Juan finishing  the cockpit assembly of  Gerardo's  Chinook, sporting shiny new covers and fresh paint job.

At the other end, Gamal mounting the the HKS engine on the FOX VI ultralight, which is almost ready for it's maiden flight.

Gerardo in the hanger coordinating the logistics and doing general cleanup work.

Seeing this, and not wanting to interrupt the brisk pace of work going on, I resigned myself to wait till next weekend before being able to give a good first look to the just arrived GOAT ultralight glider.

But then, I though... maybe I could just take a quick look to make an inventory of what arrived, that way if something was missing or broken during inspection (by our "wonderful friends"<sarcasm> at port customs) I could email the builder ( Michael Balogh in New York)  right away.

First looks at the gear
How naive of me. I had not finished popping open the first crate, and people where already dropping by to see what was inside. Like kids on Christmas day, each one grabbed a piece and carefully inspected them while pronouncing their opinion on the product. Ahh great , it is *all* aviation aluminum ! (not mixed with cheap stuff , like we got on the 1st Brazilian ultralight) said Juan. Check out the workmanship.. these guys do neat work exclaimed Gamal. Check these edges.. I wonder if they used a CNC to make them asked Gerardo.

And the instructions, someone asked..
Instructions? we "no need no" stinking instructions I joked..

Piece by piece, the main cabana started coming out, the seat, the wheel..
- Ah look , the wheel goes here..
- Pass me a 3/16 wrench, look it just goes in like that..

This is the tail boom I heard, it connects here ... yes, it is clearly marked, top and right
- Pass me a 1/8th .. hold there..

Next thing we know, the cabana was fully assembled, including the tail and rudder.
Gerardo at the controls, Alex waits for his turn!

Assembling the fuselage portion of the kit was quite easy, it probably took us 45 minutes. all parts fitted smoothly, the holes cleanly matched and the general workmanship of excellent quality.

All in all we got a great first impression of the kit.
Proud of their new toy

Next week we will be painting everything with zinc based primer (corrosion is the worst enemy around here) and starting to put together the wings.
Against the wall till next weekend

Ok, that was it for today, time to go fly.
We worked all day, but there is always time for a sunset flight!



Thursday, October 16, 2014

The Pelican is *in* the building.

Now it is for real.... After 20 days fighting mind boggling red tape at customs, the pelican finally arrived.

I could go on and on about the ridiculous paperwork they asked us for, but I'll say for any other person interested on bringing an un-assembled ultralight in to Peru.. make sure you show up with an assembly manual, a schematic of the aircraft, a list of parts on the kit and then...  they want everything translated to Spanish!!!

Anyway here are some nice pics from the arrival

Gerardo and Cesar receiving the precious cargo

Quickly, club members showed up to help unload the latest addition to the flight line. 
Our volunteer unloaders

And set it on the main hanger for its assembly and eventual painting.

So many toys, so little space!

Our hanger is quite close to the sea, so rust proof undercoating (inside and outside of the aluminum tubes) will be our first priority. For wing covering we will be using Stewart Systems Ekobond (on it's way from Miami as I write) and regular ceconite fabric. 

We have not yet decided the paint design, so ideas are welcomed!


Friday, September 19, 2014

The pelican is here!

After a month being build, twenty more days on a ship and a week waiting in customs, finally the Super Goat Kit ( made by M.H. Balogh ) is here!


Here are some of the pictures of the kit, still siting at the customs storage facility awaiting clearance from customs (and duties) to enter the country.

Crates fresh out of the shipping container
The wing ribs

Airframe

Other view





I'll keep you posted as we make progress on the project.